Admissions Open

Toll Free : 1800 2740 240

logo white (1)

The paper studies three stage open shop scheduling problem in which job processing time on each machine are given in fuzzy environment and are presented by triangular fuzzy membership function. The objective of the study is to obtain an optimal sequence through branch and bound technique in order to minimize the total elapsed time. A numerical illustration is provided to illustrate the computational efficiency of proposed algorithm.

Admission Enquiry 2025-26

Skip to content