Admissions Open

Toll Free : 1800 2740 240

logo white (1)

The present paper describes two stageflow shop Scheduling problem under uncertainty situation.An efficient heuristic technique is proposed to present the results.The processing time and the setup time of all the jobs on machines are uncertain and are presented by triangular membership function. The main objective of this paper is to attain a schedule which minimizethe total waiting time of jobs.Finally, computational results for this problem are provided to evaluate the performance of the proposed algorithm

Admission Enquiry 2025-26

Skip to content