Admissions Open

Toll Free : 1800 2740 240

logo white (1)

This study presents a solution algorithm for the problem of minimizing the makespan on equipotential parallel machines at every stage in two stage flow shop scheduling model. The processing time of all the jobs on all the two machines is given and the time for which parallel equipotential machines are available is also given. Transportation time for moving the jobs from first mach ine to second machine is also taken into consideration. A mathematical illustration is also given in support of the algorithm proposed.

Admission Enquiry 2025-26

Skip to content